
Windows v1
Battlegroup Sea Lines
Choose your coast. Build a force. Keep the supply trucks moving.

Lunar rescue Browser game
Nightfall Tether
Two crew. One line. Hold the tug above the capsule, lower the winch and carry them over the ridge.
19 results

Windows v1
Choose your coast. Build a force. Keep the supply trucks moving.

In Development
Build your defences, command the Warden and hold the gate.

Breaker Bay
Jump the gaps on the quay and punch through a stack of crates. Find the missing robots and bring them to the crew lift.

Glasswake
Swim a loop around a cluster of lanterns and seal the wake. The lights feed your wyrm as it moves into deeper currents.

Piazza Express
Share a pizza between the diners. Recut the same whole and serve each ticket with exactly the right fraction.

Vesper Patrol
Shoot the ship showing the right product, then fly under its falling escape pod. Take on the wardens as the fleet closes in.
Earth science
Move tectonic plates and explore earthquakes and tsunami waves.

Space · WebGL
Explore the planets, their moons and the distances between them.

Tidegate
Shift the counterweights, raise both leaves for a ship and bring the deck level for the next tram.

Storm Post
Fly the cloud channel, line up over the moving mailship and release a parcel onto its deck.

Lantern Ferry
Take the ferry past reefs to two lit jetties. Board the animals and steer them back to the harbour.

Reactor Rebound
Aim a salvage probe through the chamber, bend its flight and recover the reactor couplings.

Northstar Towline
Take a laden barge through the buoy gates, watch for the crosswash and shorten the towline for a tighter turn.

The Orrery
Fit drive wheels and reversing idlers to a brass orrery. Turn the handle and bring the planets into their charted windows.

Glass Negative
Slide the rows and columns to restore a broken photograph. Inspect the restored scene to find the missing evidence.
Generative physics
Place a gravity well and bend a stream of particles into an orbit.
2D and 3D drawing
Sketch a line, give it depth and turn it into a 3D drawing.

Nightfall Tether
Hold the R6 tug above a stranded capsule, lower its winch and fly the crew home with the capsule swinging beneath you.

Editable Excel
Inspect a fictional Excel example, try the blank file and read the guide.